STRINGA-LEVEL™

www.MarkeIndustries.com
| | | | | |


INSTALLATION INSTRUCTIONS



  DOWNLOAD/PRINT PDF INSTRUCTIONS                                      WATCH SHORT INSTRUCTION VIDEO                                                                                                                   WATCH FULL INSTRUCTION VIDEO                                                                                                                               [approximate 10 minute download]

1. Roughly step off how STRINGALEVEL will best fit your particular project
(as in cornering, entering and exiting a radius, incorporating the use of rigid sections…etc.)



2. Determine desired layout reference point and mark wall.



3. Hold first section to mark and secure one end of STRINGA-LEVEL to wall using backerboard or drywall screws. The use of 1/4" washers is also recommended to prevent damage to screw slot edges. Extend piece making sure bubbles are in the level position and screw in opposite end. ((NOTE: Be sure not to over tighten screws. Just snug against wall is all that is necessary to hold STRINGA-LEVEL in place.) Finish by screwing the inner slots as needed.



4. Interlock following sections by sliding the ends into one another and repeat the securing procedure.
 (If STRINGA-LEVEL does not configure perfectly to your situation, simply continue without interlocking.)



5. Begin stacking your material.



6. After material has set, unscrew STRINGA-LEVEL to remove.


7. Gently scrape and/or sponge clean to ensure years of continuous service.






Home   |   Contact Us  |   Installation   |    Order Online   |   Local Dealers   |   Warranty  

www.PRE-PITCH.com www.KIRB-PERFECT.com www.QUICK-PITCH.com